The St. George location is a Tier III data center located near the Tonaquint business park. It was built in 2008 to the highest specifications with businesses, educational institutions, and governmental organizations in mind. As a bonus, The data center provided critical infrastructure to the St. George area, bringing faster internet and increased growth.
St. George
Facility Specs
Facility Size
Approximately 28,000 sq/ft
Completed
2008
Raised Floor Area
17,200 Usable Square Feet
Floor Load
625 pounds per square foot
Ceiling Height
Finished 10 feet from raised floor
Building Access Hours
24/7 – 365
Building Security
Biometric Door Locks – Video surveillance and on-site personnel 24/7 – Remote monitored shipping and receiving dock, gate and storage – Private and monitored parking – Secured perimeter fence
Loading Area
Finished 10 feet from raised floor
Carrier Neutral
Century Link – Zayo – Level3 – ELI – TDS – Utopia – Local Providers
Commercial Power
Municipal power: 25 megawatt primary substation + 15 megawatt secondary substation – Delivering power capacity of 225W per square foot – Total Power plant: 4 megawatts
Generators
Three 2-megawatt Caterpillars and eight 750-KVA Liebert UPS units – All designed to a minimum of N+1 redundancy
Fuel Tank
Fuel Storage for a minimum of 48-hour run time on backup generators – Currently 3,000 gallons on-site with additional capacity of 6,000 gallons
Fire Suppression
VESDA installed above and below raised floor – Double interlock pre-action throughout
HAVC
Forty DS, SX, DSE, and CRAC units
Customer Conveniences
3,000 square foot lower level with secure staging and storage areas – 3,000 square foot upper level with office suites, conference room, work stations, and lounge