Build to Suit 10 MW Data Center – Boise, ID

Property Highlight

Introduction

The Tonaquint BOISE Project is a spec-built Data Center with complete infrastructure for 10MW. Available immediately for build. Ideal facility for highdensity workloads, edge, or disaster recovery applications. This 30,000 SF, purpose-built data center on approximately 3.63 acres of land is served by two (2), 20,000kVA (40,000kVA total) feeds of utility power. Ten (10) MW of gross utility load serves the building. The data center has three (3)10,000 SF data halls totaling 30,000 SF with 36” raised floor. Total critical load of 6.5MW supported by UPS. The generator configuration consists of six (6) 2500 kW generators.

Summary

Design Overview

FACILITY SIZE – 65,000 SF

RAISED FLOOR AREA – 30,000 SF

FLOOR LOAD – 250 PSF

BUILDING ACCESS – 24/7 – 365

BUILDING SECURITY – Biometric security system/Video surveillance On-site personnel 24/7/365. Shipping & receiving dock with remote monitored gate and secured storage.

LOADING AREA – Finished 10 ft from raised floor

CARRIER NEUTRAL – Lumen, Zayo, Level3, TDS, Syringa, Cogent, Comcast

COMMERCIAL POWER – City Municipal power. 15 Megawatt primary substation. 15 Megawatt secondary substation. Total power capacity 4 Megawatts

FUEL TANK – Fuel storage at minimum 72-hour run time. 6,000 gallons on-site.

GENERATORS – Six (6) 2.5 Megawatt Caterpillars. Generator plant designed at minimum N+1 redundancy

FIRE SUPPRESSION – VESDA double interlock pre-action throughout

HVAC – 2220 tons of air-cooled chillers with integrated free-cooling capabilities.

CUSTOMER WORKING SPACE – Secure staging/storage, offIce suites, conference room, work stations, TV entertainment lounge

Floor Plan

Future floor plan in Boise

Ready to start your project?

Request more information or set up a meeting.