Build to Suit 4 MW Data Center – St. George, UT

Property Highlight

Introduction

Tonaquint Phase II Data Center with complete infrastructure for 4MWs of critical load in place. Available for build immediately. Ideal facility for primary colocation, edge, or disaster recovery applications. This 15,000 SF, purpose-built data center on approximately 1.65 acres of land is served by two, 15,000kVA (30,000kVA total) feeds of utility power. Four (4) MW of gross utility load serve the building. The existing configuration supplies the data center with two (2) 2MW feeds of redundant power from geographically diverse sub-stations provided by city utility. The data center has five (5) 3,000 SF contiguous data halls totaling 15,000 SF with 36” raised floor and 2.5 MW of UPS infrastructure.

Summary

Design Overview

FACILITY SIZE – 24,000 Sq. Ft.

RAISED FLOOR AREA – 15,000 usable Sq. Ft.

FLOOR LOAD – 625 PSF

BUILDING ACCESS – 24/7 – 365

BUILDING SECURITY – Biometric security svstem/Video surveillance On-site personnel 24/7/365. Shipping & receiving dock with
remote monitored gate and secured storage.

LOADING AREA – Finished 10 ft from raised floor

CARRIER NEUTRAL – Century Link, Zayo, Level3, TDS, Utopia, Cogent, Comcast

COMMERCIAL POWER – City Municipal power. 15 Megawatt primary substation. 15 Megawatt secondary substation. Total power capacity 4 Megawatts

FUEL TANK – Fuel storage at minimum 48-hour run time. 6,000 gallons on-site.

GENERATORS – Three (3) 2 Megawatt Caterpillars and eight (8) 750 KVA Liebert UPS units. Generator plant designed at minimum N+1 redundancy

FIRE SUPPRESSION – VESDA double interlock pre-action throughout 

HVAC – Forty (30+ton) DS, SX, DSE CRAC units

CUSTOMER WORKING SPACE – Secure staging/storage, offIce suites, conference room, work stations, TV entertainment lounge

Floor Plan

Ready to start your project?

Request more information or set up a meeting.